摘要
介绍了两座模块式高温气冷堆带1台汽轮发电机组核电站的技术方案和运行特点。通过对堆机协调控制要求进行研究,提出了堆机跟随控制策略,重点叙述了模块指令的分配方式和模块投入条件,为下一步的工程调试提供参考。
The technical scheme and operation characteristics of a nuclear power plant combined with two modular high-temperature gas cooled reactors and one steam turbo generator are presented. The coordinated control strategy is established by studying the requirements of the coordinated control of reactors and steam turbo-generator. The distribution method of the module command and the condition under which the other module shall join up are mainly described. The research result can provide reference for the next step of engineering