摘要
随着现代地铁工程建设进程与速度的加快,地铁工程建设的条件日渐复杂,地铁施工中的施工竖井也日益增多。论文以某工程竖井为例,通过分析现场2个施工竖井及周边地表的沉降变形,并对监测数据进行对比,得到相应的变形规律,可为今后此类工程提供借鉴。
With the rapid development of modern subway engineering, the conditions for the construction of subway projects have also become increasingly complicated. The construction of shafts in subway construction has also been increasing. This article takes a shaft project as an example, through analyzing the settlements of two construction shafts and the surrounding surface, and comparing the monitoring data, the corresponding deformation rule is obtained, it can provide areference for the future of this kind ofproj ect.
作者
国计鑫
孙广
赵士元
GUO Ji-xin;SUN Guang;ZHAO Shi-yuan(Hebei Research Institute of Construction& Geotectmical Investigation Co.Ltd.,Shijiazhuang 050031,China)
出处
《工程建设与设计》
2018年第17期46-48,共3页
Construction & Design for Engineering
关键词
地铁
变形监测
倒挂井壁法
施工竖井
subway
deformation monitoring
inverted lining method
construction shaft