摘要
新时期背景下,社会经济发展速度加快,铁路桥梁工程项目建设数量逐渐增加。要想进一步提高铁路桥梁项目的建设质量,必须在隧道施工中采用科学合理的加固技术。但在实践过程中,隧道工程的项目施工会受诸多因素影响而引发一系列的裂缝问题,不利于工程项目质量的增强。基于此,文章将郑焦城际铁路黄河特大桥作为研究案例,阐述灌浆法加固技术在该铁路桥梁隧道工程施工建设中的具体应用,希望有所帮助。
Under the background of the new era, social and economic development speeded up, and the number of railway bridge project constructions gradually increased. In order to further improve the construction quality of railway bridge projects, it is necessary to adopt scientific and reasonable reinforcement techniques in tunnel construction. However, in the process of practice, the project construction of the tunnel project will be affected by many factors and cause a series of crack problems, which is not conducive to the enhancement of the project quality. Based on this, the article takes the Zhengjiao Railway Yellow River Bridge as a research case, expounds the concrete application of grouting reinforcement technology in the construction of the railway bridge tunnel construction, hoping to be helpful.
作者
闫忠峰
YAN Zhong-feng(The 1st Engineering Co.,Ltd.of China Railway 12th Bureau Group,Xi'an 710038,China)
出处
《价值工程》
2018年第16期149-150,共2页
Value Engineering
关键词
铁路桥梁隧道工程
施工建设
灌浆法加固技术
应用
分析
railway bridge tunnel engineering
construction
grouting reinforcement technology
application
analysis