期刊文献+

关于较大型水厂取水水泵出水管阀门更换前排水问题的建议

Suggestions on Drainage before the Replacement of Outlet Valve of Water Intake Pump in Larger Waterworks
下载PDF
导出
摘要 对于供水量较大的年久水厂,随着取水水泵出水管上的阀门的老化,需要陆续的开展阀门维修或更换的工作,如何在尽量减少对生产供水的影响的条件下顺利的完成阀门更换工作,前期的管道排水工作变得颇为重要。本文结合实际经验,分析取水泵房内管道排水效果不佳的原因,总结排水应注意的问题,提出安全有效、能加快排水速度的排水方法。 For the older waterworks with large water supply, with the aging of the valves on the outlet pipe of the water intake pump, it is necessary to carry out valve maintenance or replacement work one after another. How to complete the valve replacement work smoothly under the condition of minimizing the impact on production water supply, the early stage of pipeline drainage has become very important. In this paper, with practical experience, analyzes the reasons for poor pipeline drainage in pumping station, summarize matters need attention of drainage, puts forward a safe, effective and can speeds up the drainage speed method.
作者 邓金文 Deng Jinwen(Dongjiang Water Co., Ltd., Dongguan 523000, Chin)
出处 《广东化工》 CAS 2018年第11期154-154,164,共2页 Guangdong Chemical Industry
关键词 阀门更换 影响生产 排水 valve replacement influence production drainage
  • 相关文献

参考文献1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部