摘要
桥梁结构和工艺流程在很大程度上决定了其使用性能的发挥。现浇箱梁作为一项施工整体性强、效率高的桥梁施工技术,已被大量推广与应用。挂篮现浇箱梁施工是以节段梁体为施工对象,通过运用挂篮方式开展施工工作。论文将以杭绍台高速公路第HST-TJ03合同段挂篮现浇箱梁施工项目为工程背景,针对施工质量的管理与控制进行探讨。
The structure and process of bridge construction determine its performance. As a bridge construction technology with high efficiency, the cast-in-place box girder has been widely promoted and applied. The construction of hanging basket cast-in-place girder construction is based on the section beam body, and the construction work is carried out by means of hanging basket. This paper will discuss the management and control of the construction quality in the construction project of the cast-in-place box girder in the HST-TJ03 contract section of the Hang Shao Tai highway.
作者
夏玉文
袁定辉
XIA Yu-wen;YUAN Ding-hui(ZCCC Jinzhu Transportation Construction Co. Ltd., Hangzhou 310051, China)
出处
《工程建设与设计》
2018年第8期115-117,共3页
Construction & Design for Engineering
关键词
现浇箱梁
挂篮施工
施工技术
cast-in-site box girder
hanging basket construction
construction technology