摘要
对列控中心接口标准发展3个阶段的差异性进行举例分析,通过ATP触发紧急制动停车的故障实例,对由于列控中心接口标准差异造成的安全隐患进行原因分析,并提出解决方案。
The discrepancies in the standards of the Train Control Center's interface among its three stages of development are analyzed by example. In a case of emergency braking triggered by ATP, a cause analysis of safety hazards due to the discrepancies in the standard of TCC's interface is made and solutions are proposed.
出处
《铁道通信信号》
2018年第2期14-16,21,共4页
Railway Signalling & Communication
关键词
列控中心
接口标准
差异性
问题分析
TCC
Interface standard
Discrepancyl Problem analysis