摘要
结合山西中南部铁路通道ZNTJ-11标段桥梁施工,介绍重载铁路双线薄壁空心高墩翻模施工方法,详细说明了施工方案的实施步骤和实施要点,指出采用塔吊钢筋模具整体吊装翻模施工大大提高了施工效率。
Based on the bridge construction for the ZNTJ-11 bidding section of railway channel in south-central Shanxi,the construction method of rollover moulds for thin-walled hollow high piers of dual heavy haul railways is recommend,and construction steps and key points of construction scheme are illustrated detailedly. It increases construction efficiency remarkably to hoist rollover moulds with tower crane rebar-moulds integrally.
出处
《山西建筑》
2018年第6期168-169,共2页
Shanxi Architecture
关键词
空心墩
翻模
施工方案
hollow piers
rollover mould
construction scheme