期刊文献+

一种基于Precedence-chart的装备保障能力评估方法 被引量:6

An Equipment Support Capability Assessment Method Based on Precedence-chart
下载PDF
导出
摘要 导弹地面装备包括发射系统、火力控制系统装备等,装备保障能力建设情况是导弹地面装备同步配套建设的重要部分,如何客观评估能力建设效果是全面掌握装备情况的主要依据。根据装备特点分析了主要影响因素,设定了人力人员、保障设备、保障设施、保障技术资料、保障器材及配套设施6个一级评估指标及21个二级评估指标,搭建了评估指标体系结构。并采用专家咨询法和优序图法计算了各级指标权重值,确定了影响建设的主要因素。 Missile surface equipment include launching system and fire control system.Constructionof equipment support is an important part of synchronous matching missile surface equipment.Objective evaluation of the content and effect of construction is the main basis to fully master theoverall situation of missile surface equipment. According to the characteristics of missile surfaceequipment, the main influencing factors are analyzed, and six first level evaluation index systemstructures of human personnel,support equipment,security facilities,security technical informationand supporting equipment and facilities are setted up. Alculating the index weight value at all levelsand determining the main factors of influencing construction by delphi method.
机构地区 海军航空大学
出处 《火力与指挥控制》 CSCD 北大核心 2018年第2期82-85,90,共5页 Fire Control & Command Control
基金 国家社会科学基金军事学资助项目(14GJ003-153)
关键词 装备保障 评估指标 优序图法 指标体系 equipment shore-based support, evaluation index, the precedence diagram method, indexsystem
  • 相关文献

参考文献9

二级参考文献54

共引文献125

同被引文献66

引证文献6

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部