摘要 为了解决煤层老空区积水探放距离远、难度大、工期长、成本高的问题,将精确定向钻进技术应用于急倾斜煤层老空区探放水中,并比较了定向钻进技术与排水巷技术的工期和成本。结果表明:精确定向钻进技术能够解决老空区积水的探放水难题,单孔钻探距离可达712 m;与施工排水巷相比,工期和成本均可减少约2/3;钻孔设计应尽可能预先判断积水区的最低位置,钻孔应沿煤层顶板钻进至积水区附近后从煤层顶板进入积水区。 In order to solve the problem of long distance of water detection and water release,large construction difficult,long duration and high cost in old goaf,precise directional drilling technology was applied to water detection and water release of old goaf in steep coal seam,the duration and cost of directional drilling technology and drainage roadway technology were compared.The results show that precision directional drilling technology can solve the problem of water detection and water release of old goaf in steep coal seam.Single-hole drilling distance is 712 m.Compared with drainage roadway construction,the duration and cost of precision directional drilling technology can be reduced by about 2/3.Exploration and drainage drilling design should determine the lowest position of the water area as far in advance as possible.Drilling should be along the coal seam roof into the vicinity of the water area from the coal roof into the water area.
作者 黄森林
出处 《煤矿安全》 CAS 北大核心 2018年第1期104-106,共3页 Safety in Coal Mines
关键词 定向钻进技术 急倾斜煤层 探放水 钻孔设计 老空区 directional drilling technology steep coal seam water detection and water release drilling design old goal
  • 相关文献

参考文献7

二级参考文献42

共引文献262

同被引文献64

引证文献9

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部