以某钢铁厂1 800m^3高炉为例,介绍高炉矿焦槽及上料控制系统的硬件配置、网络结构和主要控制功能。
Taking a 1 800m3 blast furnace of a steel plant as an example, the hardware configuration, network structure and main control functions of the coke stockhouse and feeding control system were introduced. The blast furnace in service runs stably and reliably with flexible and convenient material menu. It can meet the production demand completely.
出处
《化工自动化及仪表》
CAS
2017年第11期1028-1030,共3页
Control and Instruments in Chemical Industry
关键词
控制系统
矿焦槽
炼焦高炉
control system yo blast furnace,coking furnace