期刊文献+

复合地层条件下超大断面浅埋暗挖隧道曲线顶管施工参数研究 被引量:4

Research on Construction Parameter of Curved Pipe-jacking with Super-large Section Shallow Underground Excavation Tunnel in Complex Strata
原文传递
导出
摘要 为研究复合地层条件下超大断面浅埋暗挖隧道曲线顶管施工参数分布规律,以港珠澳大桥珠海连接线关键控制性工程——拱北隧道为依托,基于拱北隧道暗挖段管幕工程施工现场实测数据,采用统计分析、线性拟合等方法,总结了现场曲线管幕工程主要施工参数分布规律,建立了不同计算方法的线性拟合函数,在此基础上,提出了适用于估算珠海地区海陆相富水复杂地层顶管施工迎面阻力计算公式。 In order to study the distribution law of construction parameters in curved pipe-jacking with super-large section shallow underground excavation tunnel in complex strata,based on the fact data of Gongbei Tunnel pipe roof project which is the key control project of the Access Road on Zhuhai Side of Hong Kong-Zhuhai-Macao bridge,through statistical analysis,linear fitting and other method,the distribution laws of construction parameters incurved pipe-jacking are summarized,different linear functions are built with different calculation ways.Based the study results,the calculation formula is proposed to estimate penetration force in curve pipe jacking,which is applied in Zhuhai marine continental complex strata.
作者 王宏权
出处 《公路》 北大核心 2017年第10期266-272,共7页 Highway
基金 交通运输部建设科技项目 项目编号2013318J11300 广东省交通运输厅重大工程科技项目 项目编号2010-01-002
关键词 复合地层 超大断面 浅埋暗挖 曲线顶管 管幕工程 施工参数 研究 complex strata super-large section shallow underground excavation curved pipe-jackingpipe roof construction parameters study
  • 相关文献

参考文献6

二级参考文献14

  • 1SHINICHIRO Imamura, TOSHIYUKI Hagiwara, KENJI Mito, et al. Settlement trough above a model shield observed in a centrifuge[C]//Centrifuge 98.Tokyo, 1998:317 - 719. 被引量:1
  • 2杉山博一,後藤茂.砂質地盤における泥水式シ一ムドの下限值泥水压に関する遠心模型実験[C]//トンネル工学研究論文·報告集:1997,9:63—68. 被引量:1
  • 3松本嘉司,新井时夫,波多腰明.多円形断面シ一ルドの掘削特性に関する実験的研究[C]//土木学会论文集,1989:291—300. 被引量:1
  • 4後藤茂なと.MSD工法(メカニカル·シ一ルド·ドツキング工法)開凳一その2シ一ルド機の掘削性能に関する実験[C]//土木学会第42回次学衍講演会,1987:566—567. 被引量:1
  • 5KASHIMA Y, KONDO N, INOUE M. Development and application of the DPLEX shield method: results of experiments using shield and segment models and application of the method in tunnel construction [J]. Tunnelling and Underground Space Technology, 1996,11(1):45 - 50. 被引量:1
  • 6近藤纪夫,富迟勉,宫本克谚,等.泥土加压シ一ルド工法の耐水压实证实验[C]//土木学会第45回次学术讲演会,1990:98 被引量:1
  • 7细川腾己,滨田大辅,奥山键一,等.泥水式シ一ルドの開口率ガ砂地盤の間隙水圧とカッタ一圧に及ぼす影嚮[C]//土木学会第55回次学術講演会,2000. 被引量:1
  • 8PELLET-BEAUCOUR A L, KASTNER R. Experimental and analytical study of friction forces during micro-tunneling operations[J]. Tunnelling and Underground Space Technology, 2002, 17:83 - 97 被引量:1
  • 9中交第二公路勘察设计研究院有限公司,港珠澳大桥珠海连接线工程两阶段初步设计[R].2011年8月. 被引量:1
  • 10中交第二公路勘察设计研究院有限公司[R].港珠澳大桥珠海连接线工程地质勘察报告(两阶段初步设计)[R].2011年8月. 被引量:1

共引文献89