期刊文献+

张力腿平台丛式立管安装作业窗口分析 被引量:3

Envelopes for the installation operations of TLP cluster risers
下载PDF
导出
摘要 在对立管安装模型进行理论研究的基础上,考虑丛式立管之间的干涉作用,提出导向架-导向绳作用模拟方法,建立了TLP丛式立管-导向架-导向绳耦合分析模型,形成了一种以平台偏移值、表面海流流速组合参数形式确定TLP立管安装作业窗口的分析方法及流程,并以我国南海某深水油井为例开展了TLP立管安装作业窗口研究及参数敏感性分析,结果表明,TLP立管安装至海底井口但尚未对接成功工况下安装作业窗口最小,此时作业窗口在低流速区主要受立管回接连接器与竖直方向夹角限制,在高流速区主要受立管之间干涉的限制;随着波浪的增加,立管安装作业窗口逐渐变小;适当增加导向架数量并合理布置有助于增大TLP立管安装作业窗口;立管间距的减小会加剧丛式立管之间的干涉,从而使得TLP立管安装作业窗口变小。本文相关方法和研究成果可为TLP丛式立管安装作业提供理论依据。 Based on the theoretical research on TLP cluster riser installation processes and with the consideration of the interference between cluster risers, a simulation method for the guide line and guide frame was proposed. And a coupling analysis model of TLP cluster-risers-guide line-guide frame was developed. Analysis method and proce-dure for establishing the installation operation envelope were proposed, which was determined by the combination of such parameters as the drilling platform offset and the current speed. Taking a deepwater oil well in South China Sea as an example, a study on the installation operation envelope of TLP cluster risers and sensitivity analysis for the influencing factors were conducted. The results show that the operation envelope is narrowest when TLP risers touch the seabed but are not successfully connected. At this time point the envelope is mainly limited by the angle between the tie-back connector and the vertical in low current region? and by the riser interference in high current region. Waves have certain effect on TLP riser installation and stronger waves will lead to narrowing of the enve-lope. The number of guide frames has significant effect on TLP riser installation, so the envelope could be widened by increasing guide frames ? which have also to be properly deployed. The operation envelope narrows with the de-crease in the riser-spacing which can aggravate the interference between the risers. The research results and the relevant methods can provide practical basis for the installation operation of TLP cluster risers.
出处 《中国海上油气》 CAS CSCD 北大核心 2017年第5期126-133,共8页 China Offshore Oil and Gas
基金 国家重点基础研究发展计划(973)课题"深水海底井口-隔水管-平台动力学耦合机理与安全控制(编号:2015CB251203)" "十三五"国家科技重大专项"张力腿平台钻完井丛式立管系统设计与安全作业技术研究(编号:2016ZX05057-011)" 山东胜利石油装备产业技术研院山东省海洋石油装备重点实验室项目"深水混合生产立管(HR)设计制造关键技术研究(编号:KRKFJJ-01)"部分研究成果
关键词 张力腿平台 丛式立管 安装作业窗口 参数敏感性分析 TLP cluster risers installation operation envelope sensitivity analysis
  • 相关文献

参考文献9

二级参考文献85

  • 1Brekke J N, Soles J, Wishaby M A. et al.Drilling riser management for a DP drillship in large, rapidly developing seastates in deepwater:Proceedings of the 2004 IADC/SPE Drilling Conference. Dallas. March 2 4.2004[C]. Dallas : SPE. 2004. 被引量:1
  • 2Steddum R. The management of long. suspended strings of tubuars from floating drilling vessels: Proceedings of the 2003 Off shore Technology Conference, Houston, May 5 8. 2003 [C].Houston : OTC, 2003. 被引量:1
  • 3Sullivan E O. Brekke J N, Dib M. Riser deployment and hang off A natysis for a harsh environment:Proceedings of OMAE04 23rd Inter nalional Confercncc on Offshorc Mechanics and Arctic Engineering. Vancouver,June 20-25,2004[C]. Vancouver:OMAE,2004. 被引量:1
  • 4Kazuaki I.Kenkichi T,Katsuya M.et al. Behavior characteristics of hang off riser that considers oscillation of floating structure: Proceedings of OMAE2006 25th International Conference on Offshore Mechanics and Arctic Engineering. Hamburg,June 4-9. 2006[C]. Hamburg:OMAE,2006. 被引量:1
  • 5Amhrose B D.Grealish F,Whooley K. Soft hangoff method for drilling risers in uhra deepwater: Proceedings of the 2001 Off. shore Technology Conference. Houston. April 30-May 3. 20111 [C], Houston : OTC. 2001. 被引量:1
  • 6Sparke C P. Fundamentals of marine risers mechanics[M]. Tulsa:PennWell Corp,2007:199 -203. 被引量:1
  • 7American Petroleum Institute. API RP 16Q-1993 Recommended praclice for design selection operation and maintenance of marine drilling riser system[S]. Washington: American Petroleum Institute, 1993. 被引量:1
  • 8International Organization .for Standardization. ISO 13624-1-2007 Petroleum and nalural gas industries-Driliing and production equipment Part 1:Design and operation of marine drilling riser equipment[S]. Geneva: International Organization for Standardization ,2007. 被引量:1
  • 9Robinson E. Drilling fundamentals-DP operations-drilling with riser[C]// Marine Technology Society. Review of DP applications, consequences and cost of failures. Houston: Dynamic Positioning Committee, 1997: 1-6. 被引量:1
  • 10Ge L, Bhalla K, Stahl M. Operation integrity evaluations for deepwater drilling riser system[R]. OMAE 20400, 2010. 被引量:1

共引文献97

同被引文献34

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部