老桥拆除施工方案比选及实施 被引量:2

Comparison and Implementation of Old Bridge Demolition Construction Scheme
下载PDF
导出
摘要 近年来,随着城市飞速发展,市政路网规划更新调整周期也不断缩短,随之而来的老桥拆除重建工作也进入了近几年的多数城市市政工程的实施清单中。从当前老桥拆除施工技术现状出发,结合笔者近期参与管理实施的沿海某市老桥拆除施工的实际工作,通过综合比较,最终确定"支架+绳锯分块切割吊装拆除"的方案,并予以实施,达到预期效果。 In recent years,with the rapid development of city,the renewal and adjustment period of municipal road network planning are continuously shortened,and the accompanying demolition and reconstruction of old bridges are also listed in the implementation bill of municipal engineering in many cities.Starting from the present demolition construction technology of old bridge,according to the management and implementation of the demolition construction practices of old bridges in a city,and after comprehensive comparison,the scheme of 'bracket+rope sawing block cutting hoisting demolition' is finally determined,and is implemented to achieve the expected effect.
作者 张润泽 闵玉
出处 《城市道桥与防洪》 2017年第7期189-191,共3页 Urban Roads Bridges & Flood Control
关键词 老桥 拆除 施工方案 比选 实施 old bridge demolition construction scheme comparison implementation
  • 相关文献

参考文献3

二级参考文献4

共引文献8

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部