摘要
就新加坡AdamRoadPIE立交桥旧桥拆除工程,介绍一种快速、简洁的拆除施工方法———液压系统平移法,文中着重介绍了该方法的设计、试验及施工,为跨线桥的拆除提供了创新思路。
With the example of the old bridge removal project of the Adam Road/PIE intersection overpass of Singapore, authors state a new quick and simple removal method, the hydraulic pressure system translation method. In this article, they introduce design, test and construction of this method, and it provides a new way to remove over-line bridges.
出处
《施工技术》
CAS
北大核心
2005年第9期4-6,共3页
Construction Technology
关键词
桥梁工程
跨线桥
旧桥拆除
平移法
bridge engineering
over-line bridge
old bridge removal
translation method