摘要
结合某工程钢管混凝土柱与剪力墙组合槽钢抗剪节点施工情况,分析槽钢抗剪节点的设计原理及施工过程中的特点、难点和控制要点。介绍了一种新的钢管混凝土柱与剪力墙组合槽钢抗剪节点施工工艺流程,实现了槽钢抗剪节点施工过程的精细化,确保了槽钢抗剪节点施工质量。
This paper analyzed the design principle and the features,difficulties and control points in construction process,according to the construction situation of channel steel shear key with the combination of concrete filled steel tubular column and shear wall.It introduced a new construction process flow of the channel steel shear resisting joint with the combination of concrete filled steel tubular column and shear wall,which achieved the refinement of the channel steel shear joint construction,ensured its construction quality.
出处
《施工技术》
CAS
北大核心
2017年第12期87-90,共4页
Construction Technology
关键词
高层建筑
剪力墙
钢管混凝土柱
槽钢抗剪键
施工技术
tall buildings
shear wall
concrete-filled steel tubular column
channel steel shear key
construction