1-130m系杆拱桥斜拉扣挂系统施工技术 被引量:1

Construction Technology of Inclined Cable-stayed Buckle System for Tied Arch Bridge with 1-130m
下载PDF
导出
摘要 太兴铁路柳林河一号1-130m钢箱式系杆拱桥,位于太原汾河二库内,上跨柳林河,两侧地形陡峻,起伏较大,呈U形,地面标高相对高差约95m,两端均与隧道相连,其中小里程侧0号台距隧道口20m,大里程侧1号台距隧道口7.01m。采用缆索起重机斜拉扣挂法整体拼装的施工方法,同时根据现场实际情况,自行设计缆索起重机缆扣系统,满足现场实际施工需要。 The No. 1 1-130m steel box tied arch bridge on Taixing Railway Willow River locates in Taiyuan Fenhe Two Reservoir, across Willow River, on both sides of steep terrain, undulating, which assumes U type, relative height of ground elevation is about 95m, both ends are connected with tunnels, the small side No. 0 distance from tunnel mileage is 20m, high mileage side No. 1 distance from tunnel is 7.01m. The whole construction method of cable-stayed cable stayed buckle is adopted. According to the actual situation of the site, the inclined cable-stayed buckle system is designed, which can meet the actual needs of the construction site.
作者 李平
出处 《施工技术》 CAS 北大核心 2017年第11期21-24,共4页 Construction Technology
关键词 桥梁工程 系杆拱桥 缆索起重机 斜拉扣挂 拼装 施工技术 bridges tied arch bridges cable crane inclined cable-stayed buckle assembly construction
  • 相关文献

参考文献5

二级参考文献11

共引文献30

同被引文献2

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部