期刊文献+

武汉绿地中心核心筒施工塔式起重机选型及布置 被引量:2

Tower Crane Selection and Arrangement for Core Tube Construction in Wuhan Greenland Center
下载PDF
导出
摘要 随着现代城市化的发展,城市超高层建筑越来越多。为满足建筑造型差异化和功能化的需求,越来越多的核心筒采用异形结构,此类结构对垂直运输设备尤其是大型塔式起重机的布置要求越来越高。因核心筒内空间狭小,多台塔式起重机综合布置困难,需针对结构情况总体规划大型塔式起重机部署。重点介绍了武汉绿地中心核心筒Y形截面施工过程中塔式起重机的选型及布置。 With the development of modern urbanization, more and more tall buildings are built. In order to meet the architectural style differences and functional requirements, the core tube is used by more and more irregular structure, which has high requirement for vertical transportation equipment especially large tower crane layout. Because of the small space in the core tube, it is difficult for comprehensive arrangement of multi tower cranes, and it is necessary for overall planning of large tower crane. This paper introduces tower crane selection and arrangement for core tube construction in Wuhan Greenland Center.
出处 《施工技术》 CAS 北大核心 2017年第9期1-3,7,共4页 Construction Technology
关键词 高层建筑 异形截面 塔式起重机 选型 施工技术 tall buildings special-shaped section tower cranes selection construction
  • 相关文献

参考文献5

二级参考文献13

共引文献35

同被引文献5

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部