摘要
本文对铅酸蓄电池建设项目环境影响评价中工程分析的主要内容进行总结,对项目工艺流程、产排污环节、平衡分析、污染防治措施及污染源分析等工程分析要点进行论述,为铅酸蓄电池建设项目环境影响评价提供参考。
This paper summarizes the main contents of engineering analysis in the environmental impact assessment of lead-acid battery construction project, discusses the engineering analysis of the project process and the production and discharge, balance analysis, pollution prevention and control measures and pollution source analysis, and discusses the construction of lead-acid battery Project environmental impact assessment.
出处
《中国资源综合利用》
2017年第3期81-83,共3页
China Resources Comprehensive Utilization
关键词
铅酸蓄电池
环境影响评价
工程分析
lead acid battery
environmental impact assessment
engineering analysis