摘要
针对湘潭换流站的施工季节和建设要求,创新性的提出交流滤波器组围栏内联合式筏板基础方案,研究其布桩方式和结构形式,同时对联合式布置方案和对点式布置方案进行技术经济比较。
Based on the construction season and requirements of Xiangtan converter station, the combined-disposal raftfoundation scheme is proposed in this paper. It takes a research on pile foundation arrangement and structural style. Meanwhile,comprehensive techniques and economic comparisons are carried on the combined disposal scheme and the correspondingdisposal scheme.
出处
《湖南电力》
2017年第A01期14-17,共4页
Hunan Electric Power
关键词
换流站
交流滤波器组
围栏内设备基础
联合布置
筏板
converter station
AC filter bank
equipment foundation inside fence
combined disposal
raft