摘要
以保山市沙丙路综合管廊设计为例,参考相关规范和国内外相关工程,阐述了污水管线纳入综合管廊的设计要点和方法,包括污水管线纳入综合管廊的适宜性、管廊横断面布置、纵断面设计、污水管线应满足的技术要求、监控及报警、管材选取、检查井(口)设计、管线抗震、检修闸门的设置等内容,并对目前国内污水管道纳入综合管廊存在的问题进行了探讨,以期为其他项目提供可借鉴、可复制、可推广的工程经验。
Based on the relevant technical specifications, similar projects around the world and the example of Shabing road integrated municipal pipe gallery in Baoshan city, the key points and methods of designing sewage system pipe into integrated pipe gallery were summarized in this paper. The items below were included in the design methods and key points, such as suitability of the project, the cross-section and longitudinal section of pipe gallery, related technical demands, monitoring and alarm, pipe material, inspection well, seismic resistance, bulk head gate and so on. Moreover, the problems existed in the process of bringing sewer system into the municipal tunnel were discussed. As references for other pro- jects, these problems can be copied and promoted.
出处
《中国给水排水》
CAS
CSCD
北大核心
2017年第8期90-94,共5页
China Water & Wastewater
关键词
综合管廊
污水管线
设计要点及方法
integrated pipe gallery
sewage pipe
design key points and methods