摘要
阳煤集团五矿选煤厂为提质增效决定进行技术改造,新增原煤处理能力2.50 Mt/a,从电源及供电方式、电气设备容量、负荷计算、变压器选择、供配电系统、电气照明、防雷接地、生产系统集中控制等方面对供配电技术改造方案进行了详细描述,为整体改造奠定基础。
In order to improve quality and increase efficiency, technology transformation has been made in Coal Preparation Plant, No.5 Colliery, Shanxi Yangquan Coal Industry Group, Co..The technical transformation scheme of power supply and distribution is described in detail in the paper from the aspects of power, power supply, electrical equipment capacity, load calculation, transformer selection, power supply and distribution system, electrical lighting, lightening protection and production system centralized control, etc., which lays the foundation for the overall transformation.