摘要 针对矿山传统底部结构存在的作业安全风险性大、出矿卡漏现象严重等问题,进行了"V"型堑沟改造试验。试验结果表明,"V"型堑沟受矿可明显提高矿山生产作业的安全性和出矿效率,采场生产能力由160t/d提高到210t/d,明显增加矿山经济效益。 There are some problems of traditional bottom non of ore drawing leakage and so on. In view of these structure in a mine, such as poor working security, serious phenomeproblems, the experimental researches on the transformation of V- shaped trench were carried out. The optimization results showed that working security and mining efficiency of V-shaped trench were improved obviously. Meanwhile, the stope production could reach to 210 tons per day, which had significant meaning to improve economic efficiency.
出处 《矿业研究与开发》 CAS 北大核心 2017年第2期31-34,共4页 Mining Research and Development
关键词 分段空场采矿法 底部结构 “V”型堑沟 采场生产能力 Sublevel open-stoping method, Bottom structure, V-shaped trench, Stope production
  • 相关文献

参考文献17

二级参考文献53

共引文献100

同被引文献15

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部