期刊文献+

多目标柔性作业车间稳健性动态调度研究 被引量:25

Multi-objective Flexible Job Shop Dynamic Scheduling Strategy Aiming at Scheduling Stability and Robustness
下载PDF
导出
摘要 研究了以调度稳定性和鲁棒性为优化目标的柔性作业车间动态调度问题。建立了多目标柔性作业车间动态调度问题模型;针对动态事件特点,采用工件到达发生器和机器故障预维护发生器模拟动态事件,提出了基于周期与事件驱动的混合重调度策略,该策略在每个重调度点对工件进行完全重调度或右移重调度;为克服传统差分算法早熟的缺点,设计了一种改进的多目标差分进化算法求解该调度问题;实例验证了提出策略和算法的有效性。 A dynamic FJSP aiming at scheduling stability and robustness was studied. Firstly, an optimization mathematical model was proposed based on scheduling stability and robustness. Second- ly, by analyzing characteristics of dynamic FJSP, a job arrival generator and a predictive maintenance generator of machine breakdown were presented. In each rescheduling points, periodic and event driv- en rescheduling strategies were employed, and a complete rescheduling strategy combined with right- shift rescheduling strategy was proposed. In order to preserve the good characteristics of paternal gen- erations, an improved differential evolution algorithm was designed to solve the dynamic FJSP. The validity of the proposed strategies and algorithm was verified by instances.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2017年第2期173-182,共10页 China Mechanical Engineering
基金 国家自然科学基金国际(地区)合作与交流项目(51561125002) 国家自然科学基金资助项目(51275190 51575211) 中央高校基本科研业务费专项资金资助项目(HUST:2014TS038)
关键词 柔性作业车间动态调度问题 多目标 动态调度 稳健性 差分进化 flexible job-shop scheduling problem(FJSP) multi-objective dynamic schedule ro-bustness differential evolution algorithm
  • 相关文献

参考文献4

二级参考文献47

  • 1张超勇,饶运清,刘向军,李培根.基于POX交叉的遗传算法求解Job-Shop调度问题[J].中国机械工程,2004,15(23):2149-2153. 被引量:108
  • 2潘全科,朱剑英.作业车间动态调度研究[J].南京航空航天大学学报,2005,37(2):262-268. 被引量:29
  • 3吴秀丽,孙树栋,杨展,翟颖妮.多目标柔性Job Shop调度问题的技术现状和发展趋势[J].计算机应用研究,2007,24(3):1-5. 被引量:19
  • 4Jackson J R. Simulation Research on Job Shop Production[J].Naval Res. Log. Quart., 1957,4(3): 287-295. 被引量:1
  • 5Nelson R T, Holloway C A, Wong R M. Centralized Scheduling and Priority Implementation Heuristics for a Dynamic Job Shop Model with due Dates and Variable Processing Time[J]. AIIE Transactions, 1977,19 : 96-102. 被引量:1
  • 6Coello C A C. Evolutionary Multi--objective Optimization:a Historical View of the Field[J]. Computational Intelligence Magazine, 2006,1 (1) : 28-36. 被引量:1
  • 7Deb K,Pratap A,Agarwal S,et al. A Fast and Elitist Multiobjective Genetic Algorithm: NSGA- II[J]. IEEE Trans. on Evolutionary Computation, 2002,6(2) : 182-197. 被引量:1
  • 8Abumaizar R J, Svestka J A. Rescheduling Job Shops under Random Disruptions[J]. Int. J. Prod. Res. ,1997,35:2065-2082. 被引量:1
  • 9Raheja A S, Subramaniam V. Reactive Recovery of Job Shop Schedules-a Review[J]. Int. J. Adv. Manuf. Technol. ,2002,19:756-763. 被引量:1
  • 10Wong T N, Leung C W, Mak K L, et al. Integrated Process Planning and Scheduling/Rescheduling--an Agent--based Approach[J]. International Journal of Production Research,2006,44(18/19) :3627-3655. 被引量:1

共引文献189

同被引文献208

引证文献25

二级引证文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部