内蒙古某煤矿投料井钻成井施工工艺及控制要点 被引量:3

Construction Technology and Key Points of Control for Feeding Well Drilling and Completion
下载PDF
导出
摘要 煤矿投料井直径大,采用分级扩孔;耐磨管刚度大,对井眼的垂直度要求高,同时其质量大,对起重设备、器具要求高,施工中容易发生重大的安全或质量事故。本文通过多项工程实践,以内蒙古某投料井为例,总结了投料井钻成井施工工艺及控制要点。 Because of the large diameter of mine feeding well, grading reaming is adopted. The wear resistant pipe of feed- ing well has high stiffness and heavy weight, which has high requirements on borehole verticality, lifting equipments and appliances, serious safety or quality accidents often occur in the construction. Based on a series of engineering practices, with the ease of a feeding well in Inner Mongolia, this paper summarizes the drilling completion construction technology of feeding well and the key points of control.
出处 《探矿工程(岩土钻掘工程)》 2017年第1期57-60,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 投料井 钻成井 耐磨管 钻孔垂直度 feeding well well drilling and completion well verticality
  • 相关文献

参考文献5

二级参考文献22

共引文献16

同被引文献18

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部