合同制目标管理与动态化过程管理的结合(下)——以国家科技攻关305项目管理模式为例 被引量:1

Integration of Contract Objective Management with Active Process Management -- - With management mode of National Project305as an example
下载PDF
导出
摘要 Adopting the advanced management methods,the national project305has had its systematic and characteristic man-agement mode,which is marked by a dominant and efficient management mode integrating contract objective management with dynamic process management.A dynamic management mode with the combination of rolling plan management,full-scale quality control and economic lever,it has been promoting the industrialization of scientific achievements and is worthy to be spread. Adopting the advanced management methods,the national project305has had its systematic and characteristic man-agement mode,which is marked by a dominant and efficient management mode integrating contract objective management with dynamic process management.A dynamic management mode with the combination of rolling plan management,full-scale quality control and economic lever,it has been promoting the industrialization of scientific achievements and is worthy to be spread.
机构地区 国家 成都理工大学
出处 《国土资源科技管理》 2002年第4期69-72,共4页 Scientific and Technological Management of Land and Resources
关键词 动态化过程管理 项目管理模式 计划 组织 指挥 协调 控制 合同制目标管理 contract objective management dynamic process management rolling plan management quality control economic lever industrialization of scientific achievements
  • 相关文献

二级参考文献10

共引文献10

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部