期刊文献+

基于时间相关的数控机床系统组件更换时间 被引量:1

Replacement time of system components of NC machine tools based on time-correlation
下载PDF
导出
摘要 为了制定合理的设备维修策略,准确估计备件库存数量,提出了一种基于时间相关的数控机床系统组件更换时间分析方法。以数控机床系统组件为研究对象,首先对组件故障数据进行平稳性和趋势检验,其次考虑组件间故障时间的相关性,应用Johnson法对系统组件故障时间的次序进行修正,经参数估计和假设检验建立数控机床组件的故障过程模型。然后假设各试验机床组件故障率服从正态分布,将拟合得到的正态分布置信区间下限值作为更换失效率指标,进而计算出设备的更换时间及一定时间下该组件的备件数量。最后,通过实际算例证明了该方法的有效性和实用性。 An analysis method of time-correlation is proposed. replacement time of system components of NC machine tools based on The aims are for making reasonable maintenance strategies and accurately estimating the stock of spare parts. First, taking the system components of NC machine tools as the research object, the trend and stability of the fault data are tested. Then, considering the correlation between the fault times of the components, the fauk time sequence of the system components is modified by Johnson method. The failure process model of the system components is established through parameter estimation and hypothesis testing. Assuming that the failure rate of the test machine tool components obeys normal distribution, the index of replacement failure rate is estimated by fitting the confidence interval of normal distribution's low limit. Finally, the equipment maintainable time and spare part quantity for certain time can be calculated. A case study verifies that the proposed analysis method is practicable and effective.
出处 《吉林大学学报(工学版)》 EI CAS CSCD 北大核心 2016年第6期1946-1952,共7页 Journal of Jilin University:Engineering and Technology Edition
基金 国家自然科学基金项目(51275205) 国家科技重大专项项目(2015ZX04003002) 吉林省科技发展计划项目(20150101025JC)
关键词 机床 组件更换时间 趋势检验 平稳性检验 Johnson法 machine tool components replacement time trend test stationary test Johnson method
  • 相关文献

参考文献8

二级参考文献65

  • 1何庆.预防维修周期的数学模型[J].农业机械学报,2005,36(2):153-154. 被引量:11
  • 2司文杰,郑映烽,蔡琦.预防性维修最佳维修周期决策[J].船海工程,2006,35(5):99-101. 被引量:6
  • 3邹小理.结构的最优预防性维修周期[J].航空学报,1997,18(3):363-366. 被引量:8
  • 4..发电设备可靠性评价规程(暂行)[S].电力部电力可靠性管理中心,1997.12.. 被引量:1
  • 5王世平 朱敏波.电子机械可靠性与维修性[M].北京:清华大学出版社,2000.4. 被引量:3
  • 6薛定字,陈阳泉.高等应用数学问题的MATLAB求解[M].北京:清华大学出版社,2004. 被引量:3
  • 7JIN Y L, JIANG Z H, HOU W 1L Multi-objective integrated optimization research on preventive maintenance planning and production Scheduling for a single machine [J]. Int J Adv Manuf Technol, 2008,39: 954-964. 被引量:1
  • 8ZUBILLAGAA AO,GOTI A,SANCHEZ A. Preventive main- tenance optimization of multi-equipment manufacturing sys- tems by combining discrete event simulation and multi-objective evolutionary algorithms [J]. Production Planning ~ Con- trol, 2008,19 (4) : 342-355. 被引量:1
  • 9DAS K, LASHKARI R S, SENGUPTA. S. Machine reliability and preventive maintenance planning for cellular manufacturing systems[J]. European Journal of Operational Research, 2007,183 ( 1 ) : 162-180. 被引量:1
  • 10SUN Y, MA L, MATHEW J. Failure analysis of engineering systems with preventive maintenance and failure interactions[J]. Computers & Industrial Engineering, 2009,57 (2) : 539-549. 被引量:1

共引文献100

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部