期刊文献+

可修组件的视情更换维修与备件订购联合优化 被引量:9

Joint optimization of condition-based repair-by-replacement and spare parts provisioning policy for repairable critical components
下载PDF
导出
摘要 针对可修复杂关键组件提出周期性视情更换式维修与连续检查的(S,s)备件订购联合优化策略。在考虑确定的维修时间和非完美维修效果的基础上,分析了维修能力与维修策略、库存策略之间的权衡关系,建立了以检测周期、预防维修阈值、库存参数及维修能力为决策变量,以单位设备无限时间范围内的平均费用率最小为目标的仿真优化模型。采用离散事件仿真和遗传算法相结合的方法对模型进行求解。仿真结果表明,更换式维修和连续检查的备件订购策略相结合可以减少系统停机、提高系统可用度、降低维修成本。灵敏度分析结果表明,维修策略、备件策略和维修能力之间存在一定的权衡。 Aiming at the periodic condition-based repair-by-replacement and continuous review of repairable criticalcomponents, the joint optimization policy of (S, s) type spare provisioning was proposed. Based on the consideration of definite maintenance time and imperfect maintenance effect, the relationship between maintenance capacities, main- tenance policy and inventory strategy was analyzed. The simulation optimization model with testing period, preventive maintenance threshold, inventory parameter and maintenance capacities as the decision variable and minimum average cost rate in infinite time range as the target was established. The discrete event simulation and genetic algorithm were combined to solve this model. Simulation results showed that the combination of repair-by-replacement with continu- ous reviewed spare provisioning policy could reduce system down, increase system availability and decrease mainte- nance cost. The results of sensitivity analysis showed that the trades-off among maintenance policy, spare parts inven- tories and repair capacity were existed.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第4期909-918,共10页 Computer Integrated Manufacturing Systems
基金 山西省回国留学人员科研资助项目(2013-089) 山西省自然科学基金资助项目(2013011019-4)~~
关键词 视情更换维修 (S s)备件订购策略 维修能力 平均费用率 仿真 优化 condition-based repair-by-replacement (S,s) type spare provisioning policy repair capacity average costrate simulation optimization
  • 相关文献

参考文献18

  • 1ALENKA BREZAVCEK A H.Joint optimization of block-replacement and periodicreview spare-provisioning policy[J].IEEE Transactions on Reliability,2003,52 (1):112-117. 被引量:1
  • 2许长安,赵建民,马伦,何厚伯.成组更换策略下的备件库存决策仿真研究[J].系统仿真技术,2011,7(4):311-317. 被引量:2
  • 3WANG L,CHU J,MAO W.A condition-based order-replacement policy for a single-unit system[J].Applied Mathematical Modelling,2008,32 (11):2274-2289. 被引量:1
  • 4WANG L,CHU J,MAO W.A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure[J].European Journal of Operational Research,2009,194(1):184-205. 被引量:1
  • 5Wei Zhou,Dongfeng Wang,Jingyu Sheng,Bo Guo.Collaborative optimization of maintenance and spare ordering of continuously degrading systems[J].Journal of Systems Engineering and Electronics,2012,23(1):63-70. 被引量:6
  • 6DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.On the availability of a K-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy[J].Reliability Engineering & System Safety,2004,83(3):287-300. 被引量:1
  • 7DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.On the interaction between maintenance,spare part inventories and repair capacity for a k-out-of-N system with wear-out[J].European Journal of Operational Research,2006,174(1):182-200. 被引量:1
  • 8DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity[J].International Journal of Production Economics,2007,107(2):404-421. 被引量:1
  • 9DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.Joint optimisation of spare part inventory,maintenance frequency and repair capacity for k-out-of-N systems[J].International Journal of Production Economics,2009,118(1):260-268. 被引量:1
  • 10KABIR A B M Z,AL-OLAYAN A S.A stocking policy for spare part provisioning under age based preventive replacement[J].European Journal of Operational Research,1996,90(1):171-181. 被引量:1

二级参考文献12

  • 1甘茂治,康建设,高崎.军用装备维修工程学[M].北京:国防工业出版社,2009. 被引量:11
  • 2Acharya D, Nagabhushanam G, Alam S S. Jointly optimal block-replacement and spare provisioning policy [ J ]. IEEE Transactions on Reliability, 1986, 35 (4): 447 - 450. 被引量:1
  • 3Alenka B, Alenka H. Joint optimization of block- replacement and periodic-review spare-provisioning policy [ J]. IEEE Transactions on Reliability, 2003,52 ( 1 ) : 112 -117. 被引量:1
  • 4Yoo Y K, Kim K J, Seo J. Optimal joint spare stocking and block replacement policy [ J ]. Int J Adv Manuf Techno1,2001,18 :906 - 909. 被引量:1
  • 5TAN JONATHAN S, KRAME MARK A. A general framework for preventive maintenance optimization in chemical process operations[J]. Computers Chemical Engineering,1997, 21(12): 1451-1469. 被引量:1
  • 6DEDOPOULOS I T, SMEERS Y. An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failure[J]. Computers & Industrial Engineering,1998, 34(3): 643-654. 被引量:1
  • 7METWALLI SAYED M, SALAMS MONA S. Computer aided reliability for optimum maintenance planning[J]. Computers&Industrial Engineering,1998,35(3): 603-606. 被引量:1
  • 8BARLOW R, HUNTER L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8: 90-100. 被引量:1
  • 9RICHARD C C,MURDOCK W P J. Selective maintenance for support equipment involving multiple maintenance actions[J]. European Journal of Operational Research,2001, 129:252-258. 被引量:1
  • 10CHAO Ton Su, SUNG Chiwu. Multi-action maintenance subject to action-dependent risk and stochastic failure[J]. European Journal of Operational Research, 2000, 125(1): 133-148. 被引量:1

共引文献38

同被引文献80

引证文献9

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部