摘要 随着计算机技术、通信技术和电力系统一体化设备的发展,传统的变电站二次系统已经发展成为以设备智能化、信息传输网络化、信息模型及通信协议标准化为特点的一体化智能变电站二次系统。时间同步系统作为变电站非常关键的部分,对其开展可靠性的分析和研究显得尤为重要。本文阐述变电站时间同步系统运行过程中的各种事故,分析与总结影响系统可靠性的各种因素,在此基础上文章研究一种基于主成分分析(Principal Component Analysis,PCA)和故障树分析(Fault Tree Analysis,FTA)的时间同步系统可靠性分析方法。 With the development of computer technology,communication technology and integrated equipment of power system,traditional secondary system in substation has been developed into an integrated intelligent secondary system with the characteristics of intelligent equipment,network information transmission,information model and standardized communication protocol.Time synchronization system is a key part of the substation,so it is very important to carry out the reliable analysis and research.So this paper describes many kinds of operation accidents of time synchronization system,then analyses and summarizes the factors that affect the system reliability,finally this paper studies on an analytical method for reliability of time synchronization system based on Principal Component Analysis(PCA) and Fault Tree Analysis(FTA).
出处 《自动化与仪器仪表》 2016年第9期160-164,共5页 Automation & Instrumentation
关键词 时间同步系统 主成分分析 故障树 可靠性分析 time synchronization system principal component analysis fault tree analysis reliability analysis
  • 相关文献

参考文献12

二级参考文献135

共引文献279

同被引文献37

引证文献4

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部