期刊文献+

基于AHP-GRA的工程施工项目进度风险管理研究 被引量:1

Research on the Schedule Risk Management of Engineering Construction Project Based on AHP-GRA
下载PDF
导出
摘要 为了更好地应对工程施工项目进度管理过程中复杂多变的风险,文章站在施工方的角度借助于层次分析法构建了层次分析模型,将正在实施的某高校教学楼中可能存在的风险因素程度进行量化,然后利用灰色评价法确定风险的等级,最后制定一系列风险防范措施来应对风险的影响。研究表明利用AHP-GRA的方法对工程施工项目进度风险管理研究可以有效地控制工程施工过程中的进度风险,同时很好的避免了管理者的盲目决策,提高了工程项目效率。 In order to better cope with the complex management risk in the process of engineering construction project progress, this paper constructs the analytic hierarchy model by means of analytic hierarchy process to quantify the risk factors that may exist in the teaching building of a university. Then, it uses grey evaluation method to determine the risk level and constitutes a series of risk prevention measures to deal with the impact of risk. Study shows that the research of schedule risk management of engineering construction project by using the method of AHP-GRA can effectively control the project schedule risk in the process of construction, better avoid the managers of blind decision and improve the efficiency of the engineering project.
出处 《价值工程》 2016年第29期85-88,共4页 Value Engineering
关键词 进度风险管理 层次分析法 灰色评价法 风险防范 scheduling risk management the analytic hierarchy process gray evaluation risk prevention
  • 相关文献

参考文献9

二级参考文献34

共引文献45

同被引文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部