期刊文献+

墩顶转体桥转体定位及中跨合龙施工技术研究 被引量:6

Study on Construction Technology of Pier Span Closure and Swivel for Bridges
下载PDF
导出
摘要 为保证转体合龙精度和实现接触网不停电进行中跨合龙施工,在张呼客运专线蒙古营印河特大桥跨集包线、京包线墩顶转体连续梁施工过程中,通过对激光投线仪精确对中研究,无需测量人员上桥操作即可实现转体梁的精确对中及姿态调整。通过对中跨合龙段绝缘板吊架新技术应用,即便合龙位置邻近铁路线接触网也可在其不停电的环境下,施工人员可安全地进行施工操作。 In order to ensure the swivel and closure precision and implementation of catenary power of mid-span closure construction, in the continuous beam construction process of Zhangjiakou-Hohhot passenger dedicated line Mongolian line and Beijing—Baotou line, by the research on laser cast instrument precision,the precise swivel and attitude adjustment of the beams can be realized. An insulating plate hanger is applied in mid-span closure segment of beam,the safety of construction workers are insured,even their position adjacent to the railway contact line can also be constructed and operated under the power of the environment.
作者 陶美祥 钟祺 光明 Tao Meixiang Zhong Qi Guang Ming(No. 1 Engineering Co. ,Ltd. of FHEC of CCCC,Beijing 102205,China)
出处 《施工技术》 CAS 北大核心 2016年第18期115-118,123,共5页 Construction Technology
关键词 桥梁工程 墩顶转体 激光投线仪 绝缘板 吊架 bridges swivel pier laser cast instrument insulation board hanger
  • 相关文献

参考文献7

二级参考文献42

共引文献48

同被引文献48

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部