摘要
工程中的局部坍塌会引起相关部位的连续坍塌和损坏,需要制定专项施工方案。某地库在施工过程中发生局部坍塌,需要对地下室塌陷区域进行清理和局部拆除、剔凿,施工方案结合施工现场实际情况编制,并对施工过程中的重要技术参数进行了详细计算,保证了拆除清理工作安全、有序地进行。
In practice, a partial collapse may cause the successional collapse and damages in the rest. So a special construction scheme should be planned. Encountering a partial collapse emerged during the construction of a basement, the broken cleaning and demolition should be implemented in the collapse area of the basement. Taking the practical situation in construction spot as the background, a construction scheme was planned in detail. The key parameters in the construction were also calculated and analyzed in detail. It ensured the safety and order of the cleaning and demolition work.