摘要
采用未开挖的数值模型进行承载力试验,并与理论解答进行对比,验证该数值试验的有效性。首先建立复杂精细化的三维数值模型,模拟隧道施工过程中围岩的应力变化与变形机理,开展相关的试验研究。
This paper adopts the excavation of thenumerical model of bearing test, and compared withtheoretical solution, verify the validity of the numericalexperiments. First establish complex three -dimensionalnumerical model of refinement, simulated the process oftunnel construction stress change and deformationmechanism of surrounding rock to carry out relatedexperimental research.
关键词
隧道施工
路基承载力
FLAC3D
the tunnel construction
subgrade bearingcapacity
FLAC3 D