摘要
米山水库是一座以防洪、灌溉、城市及工业供水为主,兼顾发电和养殖等综合利用的多年调节大(2)型水库。在水库除险加固中,不但要保证工程施工安全顺利进行,还要尽可能减少水库放水损失。本文在充分考虑现场地形条件、主体工程布置特点和施工总进度安排等因素的条件下,综合设计施工导流方案,提出的导流措施既能保证工程安全施工,又能节省工程投资,同时还减少了水库的放水损失。
Mishan Reservoir is a large (2) carry-over storage reservoir which is based on flood control, irrigation, urban and industrial water supply, and gives equal consideration to comprehensive utilizations in power generation, aquaculture, etc. In reservoir risk removal and reinforcement, safe and smooth project construction should be ensured, and the water discharge loss of reservoir also should be reduced as far as possible. In the paper, construction diversion plan is comprehensively designed under the premise of fully considering various factors such as site terrain condition, main work layout characteristics, construction schedule arrangement, etc. The proposed divemion measures not only can ensure the safe construction of project, but also can save engineering investment. Meanwhile, the water discharge loss of reservoir can be reduced.
出处
《中国水能及电气化》
2016年第5期15-17,10,共4页
China Water Power & Electrification
关键词
施工导流
导流标准
导流方式
导流流量
construction diversion
diversion standard
diversion mode
diversion flow