摘要
地铁盾构区间联络通道冻结加固施工是地铁盾构施工中的重点和难点,对施工中的质量安全控制提出较高要求。本文以福州地铁工程为实例,着重从冻结方案、施工质量安全控制等几方面分析了施工中的质量安全控制要点,为今后地铁盾构施工遭遇类似的情况提供参考借鉴。
Crosspassage freezing method is a high technical content in the construction of the subway which requires the more strict quality and safety management. This article described the freezing method and its quality and safety management. It is hoped to provide a reference for the similar situation.
出处
《福建建设科技》
2016年第3期11-12,62,共3页
Fujian Construction Science & Technology
关键词
地铁盾构
联络通道冻结法
质量安全控制
The subway shield tunneling
Crosspassage freezing method
quality and safety management