团结河大桥合龙段施工关键技术研究 被引量:6

Key Technology Control on Tuanjiehe Bridge Closure Segment
下载PDF
导出
摘要 结合团结河大桥工程特点,针对大跨径钢筋混凝土预应力连续梁桥施工工艺流程,确定了中跨合龙段施工关键技术控制环节。分析和计算了相应关键施工技术环节控制参数和控制要点,提出了相应的质量保障措施。通过施工完合龙段两侧测量监测,结果表明对施工关键技术的控制,很好地保证了合龙段施工质量,对相应工程建设有很好的借鉴作用。 Base on the characteristics of Tuanjiehe bridge project and the concrete continuous beam bridge construction process,authors ascertain the key technology of mid span closure segment. By analyzing the control parameters of the key technology and control points,the corresponding measures are put forward to ensure the quality of construction. Through measuring height of the both sides of closure segment,the design and construction deviation is obtained when the engineering finished. The results show that key technology of construction control is a very important to ensure quality of the closure segment construction.
出处 《施工技术》 CAS 北大核心 2016年第10期91-93,共3页 Construction Technology
关键词 桥梁工程 预应力连续梁桥 合龙段 关键技术 施工 bridges prestressed continuous beam bridge closure segment key technology construction
  • 相关文献

参考文献4

  • 1牛志新.混凝土连续梁合拢段设计及施工要点[J].北方交通,2012(4):78-80. 被引量:1
  • 2交通部公路科学研究所.公路工程质量检验评定标准:JTGF80/1-2004[S].北京:人民交通出版社,2005. 被引量:1
  • 3周水兴等编著..路桥施工计算手册[M].北京:人民交通出版社,2001:811.
  • 4中交第一公路工程局有限公司.公路桥涵施工技术规范:JTG/TF50一2011[S].北京:人民交通出版社.2011. 被引量:1

二级参考文献2

  • 1JTG D62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S]..2004 被引量:1
  • 2TB 10002.3-2005.铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S]..2005 被引量:1

同被引文献34

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部