3[1]Operating Agreement of PJM Interconnection, L L C. PJM Interconnection L L C. First Revised Rate Schedule FERC No 24. http://www.pjm.com, 2000 被引量:1
4[2]Transmission Owners Agreement. PJM Interconnection, L L C. http://www.pjm.com,1998 被引量:1
5[3]Reliability Assurance Agreement Among Load Serving Entities in the PJM Control Area. PJM Interconnection, L L C. First Revised Rate Schedule FERC No 27. http://www.pjm.com, 2000 被引量:1
6[4]PJM Open Access Transmission Tariff. PJM Interconnection, L L C. Fourth Revised Rate Schedule FERC No 1. http://www.pjm.com, 2001 被引量:1
7Ramteen Sioshansi,Shmuel Oren.How good are supply function equilibrium models: an empirical analysis of the ERCOT balancing market[J].Journal of Regulatory Economics.2007(1) 被引量:1
8Shen Hsien Huang,Gonzalez Perez C,Dumas J,et al.Grid security through load reduction in the ERCOT mar ket[].IEEE Transactions on Industry Applications.2009 被引量:1
9Li G,Liu C C,Mattson C,et al.Day-Ahead Electricity Price Forecasting in a Grid Environment[].IEEE Transactions on Power Systems.2007 被引量:1
10ZHANG S L,ZHANG Y,CHEN H Y,et al.Research andapplication on matchmaking tradeoff competition mechanismdesign in south China power market[].IEEE Asia-PacificPower and Energy Engineering Conference.2009 被引量:1