呼延调蓄工程土工膜防渗体土坝设计 被引量:6

Earth dam design of Huyan water storage project geomembrane impervious body
下载PDF
导出
摘要 呼延调蓄工程考虑坝基工程地质条件及工程区土料存量等因素,最终选定修筑土坝,且经地质勘察、岩土实验证明,西部岸坡开挖出的低液限黏土可以直接上坝,加之本工程为调蓄水池,不存在溢洪、施工导流等建筑物布置问题,而且土坝具有坝基地质条件要求较低、便于组织机械化快速施工、施工简单等优点,无论从经济上、技术上均有明显优势。 Huyan diversion and storage project dam foundation engineering geological conditions of the project area and soil material stock factors to consider, eventually selected the construction of the dam and the geological survey, geotechnieal experiments prove, western slope excavation of low liquid limit clay can be directly on the dam, coupled with the project for storage pond, there is no spillway, the construction diversion of the building layout problem and earth dams have the geological condition of the dam foundation is lower, thus being convenient for mechanical tissue of rapid construction, the advantages of simple construction, no matter from economy and technology has obvious advantages.
作者 王瑞波
出处 《水科学与工程技术》 2016年第2期71-73,共3页 Water Sciences and Engineering Technology
关键词 呼延调蓄工程 调蓄池 防渗体土坝 设计 Huyan diversion and storage project storage tank anti-seepage dam design
  • 相关文献

参考文献5

二级参考文献7

共引文献39

同被引文献19

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部