期刊文献+

景兴水库除险加固设计浅析

A brief analysis on danger control and reinforcement design of Jingxing reservoir
下载PDF
导出
摘要 本文以景兴水库除险加固工程设计为例,通过分析现有水库存在的问题及工程地质情况的条件,对现有工程规模进行复核,对比确定了本水库合适的泄流方案,在土坝设计、有闸溢洪道设计、机电设备及金属结构设计三个方面对工程优化设计进行介绍,以期为其他水库工程除险加固设计提供一定的借鉴。 Taking danger control and reinforcement design of Jingxing reservoir as an example in this paper, By analyzing the existing problems of reservoir and engineering geology conditions, check the scale of existing projects and determine the proper discharge scheme for the reservoir. The engineering optimum design is presented in three aspects from earth dam design, fried spillway dam design, mechanical and electrical equipment and metal structure design, thus provides certain reference for danger control and reinforcement design of similar reservoir.
作者 李艳 王洪淼 LI Yan WANG Hongmiao(Jilin Yinhe water conservancy and hydropower New Technology Design Co. , Ltd. , Changchun 130000, China Jilin water conservancy and Hydropower Survey and Design Institute, Changchun 130000, China)
出处 《黑龙江水利》 2016年第11期53-56,共4页
关键词 景兴水库 除险加固设计 溢洪道 Jing xing reservoir danger control and reinforcement design spillway
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部