4Li Wang,Yong Qin,Jie Xu,and Limin Jia.A Fuzzy Optimiza- tion Model for high-speed Railway Timetable Rescheduling [J].Dis- crete Dynamics in Nature and Society,2012(10): 1-22. 被引量:1
5Hou Tao,Niu Hong-xia,Fan Duo-wang.Speed Contron for High-speed Railway on Multi-mode Intelligent Control and Feature Recognition[J]. Telkomnika, 2012(8): 2069-2074. 被引量:1
6HanningWang,Weixiang Xu,Futian Wang.A Cloud-Comput- ing- Based Data Placement strategy in High-speed.Railway[J].Dis- crete Dynamics in Nature and Society, No.396387,2012(10): 1-15. 被引量:1
8Abril M,Barber F,Ingolotti L. An Assessment of Railway Capacity[J].Transportation Research Part E:Logistics and Transportation Review,2008,(05):774-806. 被引量:1
9Alex Landex,Anders H Kaas,Bernd Schittenhelm. Evaluation of Railway Capacity[A].Aalborg,Denmark:Aalborg University,2006.232-253. 被引量:1
10Alex Landex. Methods to Estimate Railway Capacity and Passenger Delays[D].Lyngby,Denmark:Technical University of Denmark,Department of Transport,2008.7-70. 被引量:1