期刊文献+

地锚式沉井压入施工阶段对环境影响监测成果分析 被引量:12

Analysis of monitoring results of environmental impact on anchor caisson in pressing construction phase
原文传递
导出
摘要 沉井施工不可避免地扰动周围地层,导致地表沉降,从而对周围的建(构)物产生影响。结合实际工程,提出地锚式沉井压入施工方案,并对压沉过程中井壁周边土体水平位移、地表沉降、土体分层沉降、管线沉降等的现场施工监测数据进行分析,探讨地锚式沉井施工对周边环境的影响。结果表明,地锚式沉井施工具有下沉速度快、对周边环境影响较小等特点,可为今后考虑施工因素的沉井结构设计提供依据。 Caisson construction will inevitably disturb the surrounding strata,cause surface settlement and impact the surrounding buildings or structures. Combined with the practical engineering experience,the pressing construction scheme of anchor caisson was put forward. The field construction monitoring data in pressing process were analyzed,including the horizontal displacement of soil around caisson walls,ground surface settlement,soil layered settlement and underground pipeline settlement, to investigate the effects of anchor caisson pressing construction process on the surrounding environment. The results show that the anchor caisson pressing construction has characteristics of rapid speed and little effect on the surrounding environment,which can provide the basis for future caisson structural design with consideration of the construction factors.
作者 罗实瀚 徐伟
出处 《建筑结构》 CSCD 北大核心 2016年第8期100-105,共6页 Building Structure
关键词 地锚式沉井 现场监测 地表沉降 土体水平位移 土层分层沉降 管线沉降 anchor caisson field monitoring ground surface settlement soil horizontal displacement soil layered settlement underground pipeline settlement
  • 相关文献

参考文献10

二级参考文献10

共引文献56

同被引文献102

引证文献12

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部