期刊文献+

BIM技术在深基坑施工中的应用 被引量:21

Application of BIM in deep foundation pit construction
下载PDF
导出
摘要 以某深基坑为例,阐述了BIM技术在该深基坑中的应用,重点介绍了深基坑3D模型的建立、基坑监测数据实时查看、复杂节点配筋、施工进度模拟等内容.实践证明,通过BIM技术可为深基坑工程施工解决一些重难点问题,有效地保证了施工的质量与进度. Based on a deep foundation pit, this paper introduced the application of BIM in the foundation pit project, mainly including building 3D model,viewing real-time data of pit monitoring, complex joints reinforcement, construction sequence simulation. It showed that using the BIM technology can solve difficult problems and ensure the construction quality and schedule effectively.
出处 《广州大学学报(自然科学版)》 CAS 2016年第1期64-68,共5页 Journal of Guangzhou University:Natural Science Edition
关键词 深基坑 监测 节点 4D模拟 deep foundation monitoring joints 4D simulation
  • 相关文献

参考文献11

二级参考文献23

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2邓雪原,张之勇.计算机辅助建筑设计软件间的信息共享与交换[J].湖南科技大学学报(自然科学版),2006,21(1):54-58. 被引量:5
  • 3CHAU K W, ANSON M, ZHANG J P. 4D dynamic construction management and visualization software: 1. development [J]. Automation in Construction, 2005, 14 (4) :512-524. 被引量:1
  • 4CHAU K W, ANSON M, SARAM D D D. 4D dynamic construction management and visualization software: 2. site trim [J]. Automation in Construction, 2005, 14 (4) :525-536. 被引量:1
  • 5WANG H J, ZHANG J P, CHAU K W, et al. 4D dynamic management for construction planning and resource utilization [ J ]. Automation in Construction, 2004, 13 (5) :575-589. 被引量:1
  • 6CHAU K W, ANSON M, ZHANG J P. Four-dimensional visualization of construction scheduling and site utilization [ J ]. Journal of Construction Engineering and Management, 2004, 130 (4) :598-606. 被引量:1
  • 7ZHANG J P, HU Z Z. B1M-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. principles and methodologies [ J ]. Automation in Construction, 2011,20 (2) : 155-166. 被引量:1
  • 8POPOV V, JUOCEICIUS V, MIGILINSKAS D, et al. The use of a virtual building design and construction model for de- veloping an effective project concept in 5D environment [ J]. Automation in Construction, 2010, 19 (3) :357-367. 被引量:1
  • 9KYMMELL W. Building information modeling: planning and managing construction projects with 4D CAD and simulations [ M ]. New York : McGraw-Hill, 2008. 被引量:1
  • 10LI H, CHAN N, HUANG T, et al. Optimizing construction planning schedules by virtual prototyping enabled resource a- nalysis [ J]. Automation in Construction, 2009, 18 (7) :912-918. 被引量:1

共引文献240

同被引文献86

引证文献21

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部