摘要 针对部分工业企业采用"雨污分流"的设计存在净化雨水的问题,以某铜冶炼项目为例,采用"初雨分流"的理念,以求获得更高效的循环水系统。本文综合考虑了雨水的污染源、地理环境、环保要求和经济效益等因素,并对厂区的分流系统进行重新改造,实现了铜冶炼厂区初期雨水尽可能的回用于生产。 According to the problem of rainfall purification existed in design of rainfall-sewage diversion adopted in part of industrial enterprises, taking a certain copper smelter as an example, the idea of initial rainfall diversion is adopted to obtain high-efficiency circulating water system. The paper takes factors of pollution resources of rainwater, geographical conditions, environmental requirement and economic benefit into consideration, diversion system should be renovated to accomplish the objective of "zero discharge" of copper smelter waste water.
出处 《有色冶金设计与研究》 2016年第1期44-46,50,共4页 Nonferrous Metals Engineering & Research
基金 国家自然科学基金项目51364016 江西省教育厅科技计划项目GJJ14413
关键词 铜冶炼厂 初雨分流 雨污分流 循环水系统 copper smelter initial rainfall diversion rainfall-sewage diversion circulating water system zero discharge
  • 相关文献

参考文献15

二级参考文献24

共引文献70

同被引文献11

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部