期刊文献+

尼日利亚阿布贾城铁大坡道小半径曲线架梁施工技术 被引量:7

Construction Technology of Girder Erecting for Abuja Urban Railway with Heavy Gradient and Minor Radius Curve in Nigeria
下载PDF
导出
摘要 介绍DJ168公铁两用架桥机在大坡度小曲线半径线路上的架梁技术,重点介绍架桥机在特殊条件下的架梁措施、架梁施工方法及施工注意事项,该技术已成功应用于阿布贾城铁项目一期IDU站出入段大桥,并取得了良好的效果。 This article is to introduce the technique of beam erecting on the bridge with heavy gradient and minor radius curve by DJ168 highway-railway dual-use bridge erecting machine, which emphasizes on the measures of beam erecting, construction methods of beam erecting and matters needing attention in construction under special conditions. The technolo- gy has been successfully applied in IDU Station Entrance Super Major Bridge of Abuja Rail Mass Transit Project' s first phase, and achieves good results.
作者 许军
出处 《铁道建筑技术》 2016年第1期25-29,共5页 Railway Construction Technology
基金 中国铁建股份有限公司科技研究开发计划项目(07-07C)
关键词 架桥机 大坡道 小半径曲线 架梁 bridge erecting machine heavy gradient minor radius curve beam erecting
  • 相关文献

参考文献13

二级参考文献8

共引文献20

同被引文献44

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部