潍坊滨海水城人工沙滩防护工程效果物理模型试验研究 被引量:4

Research on effect of protection engineering for seashore water city artificial beach in Weifang based on physical model tests
下载PDF
导出
摘要 文章针对潍坊滨海旅游度假区人工沙滩防护工程进行研究,分析了工程海域自然条件和沙滩侵蚀成因,对滩沙水力特性进行了实验研究,最后通过波浪泥沙整体物理模型试验手段,分析了丁坝防护工程建设后的整治效果。其主要结论如下:潍坊滨海旅游度假区人工沙滩侵蚀的破坏性动力来自NE向波浪的持续向西输沙;正常天气下人工沙滩年损失量约为2万m^3,在极端高水位下如遭遇10 a一遇大浪作用24 h条件下,沙滩损失量为1.2万m^3,人工沙滩年损失量约为7.7万m^3;优化方案实施后,防护工程实施1 a后,人工沙滩年损失量约为6.4万m^3,约占总铺砂量的6%;且抑制东湾内泥沙在风暴潮增水作用下向西湾输送,达到了优化目的。 The protection engineering for the artificial beach in Weifang seashore tourism resort was researched through analysis of the natural condition of the engineering sea area and the reason for the beach erosion,hydraulic characteristics tests of the sediment, and the analysis of the effect of the spur dike protection engineeringbased on the wave-sediment physical model tests. Conclusions are drawn as follows: the driving force of the destructive erosion mostly comes from the continuous sediment transport by NE direction wave. The annual sediment loss isabout 20 thousand cubic meters under normal weather conditions. The sediment loss is 12 thousand cubic metersunder 10 years frequency wave for 24 hours at extreme high water level,and the annual loss will be 77 thousand cubic meters. After the construction of the protection engineering according to the optimized scheme, the annual losswill be 64 thousand cubic meters, which accounts for 6% of the total sediments, and the sediment transports fromeast bay to west bay under storm surge effect. Then the goal of the optimization is achieved.
出处 《水道港口》 2015年第6期467-473,共7页 Journal of Waterway and Harbor
关键词 人工沙滩 波浪 方案 模型试验 artificial beach wave scheme model test
  • 相关文献

参考文献8

二级参考文献12

  • 1宋向群,郭子坚,陈士荫.星海湾人工海滨浴场的规划设计研究[J].土木工程学报,2005,38(4):134-140. 被引量:25
  • 2MAURICIO G,RAUL M.On the application of static equilibrium bay formulations to natural and man-made beaches[J].Coastal Engineering,2001,43(3):209-225. 被引量:1
  • 3U.S.Coastal Engineering Research Center.Coastal engineering manual[M].[s.l.]:U.S.Coastal Engineering Research Center,2003. 被引量:1
  • 4KLEIN A H,HSU J R.Visual assessment of bayed beach stability with computer software[J].Computers & Geosciences,2003,29:1249-1257. 被引量:1
  • 5许荣中.海岸新工法--人工岬湾与养滩综合工法.海下技术月刊,2002,12(2):35-48. 被引量:3
  • 6吴明阳,刘国亭.上海国际航运中心洋山深水港区南港区前期研究水文泥沙测验分析报告(2013年4月)[R].天津:交通运输部天津水运工程科学研究所,2013. 被引量:1
  • 7吴明阳,刘国亭.上海国际航运中心洋山深水港区四期工程水文泥沙测验分析报告(2013年7月)[R].天津:交通运输部天津水运工程科学研究所,2013. 被引量:1
  • 8左书华,杨华.上海国际航运中心洋山深水港洋山海域和西港区水域冲淤演变分析报告[R].天津:交通运输部天津水运工程科学研究所,2009. 被引量:1
  • 9朱巧云,毕军芳.洋山深水港南港区前期研究水文测验技术报告[R].上海:长江水利委员会水文局长江口水文水资源勘测局.2013. 被引量:1
  • 10张征,李蓓,左书华.上海国际航运中心洋山深水港区四期工程建设方案数学模型研究报告[R].天津:交通运输部天津水运工程科学研究所,2013. 被引量:1

共引文献146

同被引文献43

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部