摘要
介绍宁波光明通用泊住升级改造工程工艺系统改造的思路和方案。在不影响现有生产的前提下,通过调整工艺流程和更新装卸设备,使泊位等级和装卸设备配置与实际到港船型匹配,工艺流程更加合理。改造后码头通过能力显著提高,码头卸船能力与堆场能力相适应。
This paper expounds the idea and scheme of renovation for the technological process system of Ningbo Guangming general berths upgrading renovation engineering. Under the premise of not influencing the existing production, we adjust the technological process and update the handling equipment to match the berthing grade and design ship type and ensure more reasonable technological process. By the innovation, the port through capacity is greatly improved, and the yard capacity matchs well.
出处
《水运工程》
北大核心
2015年第11期94-97,109,共5页
Port & Waterway Engineering
关键词
散货码头
码头改造
装卸工艺
工艺流程
bulk terminal
wharf renovation
handling technology
technological process