西门子1000MW汽轮机快速冷却系统应用与分析 被引量:2

The Application and Analysis of Fast Cooling System in Siemens 1000-MW-Turbines
下载PDF
导出
摘要 汽轮机打闸后需要盘车运行一段时间,如果盘车运行时间长将使检修工期延长,同时也会增加相关系统运行成本.为缩短检修工期,并兼顾节能降耗,在机组停运后一般均采用汽轮机快速冷却(简称“快冷”)方式来加速内部部件冷却速率,减少盘车运行时间.从汽轮机打闸到盘车停运,在自然冷却情况下,需要12~15天;采取快速冷却方式后,耗时一般少于5天,因此可至少提前1周停运盘车.根据西门子1 000MW汽轮机典型快冷案例,对汽轮机快冷操作流程及过程中存在的问题进行阐述和分析,总结了具有一定参考价值的操作流程及控制手段。 Generally, some certain time of turning gear is needed after a steam turbine shutdown. However, long-tinle turning gear will definitely extend the overhaul period and increase the operating costs of the related oil system. For the purpose of shortening the repairing period and conserving energy, fast cooling is adopted to accelerate the cooling rate of the internal components and reduce the turning gear period after the turbo set outages. Under natural cooling conditions, it takes about 12 to 15 days from turbine tripping to turning gear being switched off; but when fast cooling is adopted, it takes less than 5 days, saving 7 days at least. Regarding the typical fast cooling cases of Siemens 1 000-MW steam turbine, this paper presents the fast cooling operating procedures and analyzes some existing problems, and finally summarizes the procedure and controls for reference.
出处 《中国电力》 CSCD 北大核心 2015年第11期7-12,共6页 Electric Power
关键词 汽轮机 快速冷却 盘车 1000 MW机组 steam turbine fast cooling turning gear 1 000 MW unit
  • 相关文献

参考文献11

二级参考文献18

共引文献27

同被引文献17

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部