期刊文献+

某工程竖向墙体后浇带挂板侧模施工技术

Poured mold construction technology after siding with vertical side walls
下载PDF
导出
摘要 对于大面积整体地下结构工程(如地下车库),通常后浇带要在结构施工完成1个月以后才允许浇筑混凝土.但为了保护地下室外墙的防水效果,外墙防水卷材应连续1次完成.传统的后浇带外侧独立挡水板做法有铺设钢板和砌筑挡土墙的方法,但这2种方法都存在材料消耗及费用较大,工人操作不方便等缺点.结合具体现场工程实例,以实际住宅楼地下车库工程竖向墙体后浇带挂板侧模施工为基础,对地下回填土竖向墙体后浇带挂板侧模的施工技术及施工过程进行了全面系统的阐述. For an overall underground structure engineering(such as underground garage),concrete pouring will be carried on in a month when pouring belt completed.In order to ensure the efficiency of basement wall waterproof,the exterior waterproofing materials will be finished one time.Traditional post pouring belt lateral water baffle proves to be independent in laying steel and masonry retaining wall,but it is obvious that the shortcomings of material consumption and great cost,inconvenience in doing exist.In combination with the specific site in real engineering example,the article comprehensively states the underground backfill soil of post-cast strip vertical wall construction technology and construction process,based on actual residential buildings with underground garage project of post-cast strip vertical side wall construction.
出处 《青岛理工大学学报》 CAS 2015年第5期115-119,共5页 Journal of Qingdao University of Technology
关键词 竖向墙体 后浇带 挂板侧模 施工技术 vertical wall post-cast strip hanging side form construction construction technology
  • 相关文献

参考文献3

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部