期刊文献+

水电工程社会稳定风险分析模型研究 被引量:3

Study on Social Stability Risk Analysis Models of Hydroelectric Projects
下载PDF
导出
摘要 目前我国水电工程社会稳定风险分析评估工作还存在一些问题,构建水电工程社会稳定风险评价指标体系,建立社会稳定风险分析模型,综合运用层次分析法与模糊综合评价法,可以解决风险分析中的量化问题,从而提高评估结果的准确性与有效性。以BHT水电站为例进行了实例分析,结果表明提出的分析模型在水电工程社会稳定风险分析评估中具有一定的适用性和可操作性。 Currently, the social stability risk of hydroelectric projects in China is not completely evaluated. By building an index system on social stability risk analysis of hydroelectric projects and an analysis model on social stability risk analysis, and using the method of analytic hierarchy process and fuzzy comprehensive evaluation, the problem of quantitative risk evaluation can solved and the accuracy and validity of evaluation results can be improved. Taking the BI-IT hydropower station as an example, the results show that the model is suitable and feasible in the social stability risk analysis of hydroelectric projects.
作者 祁昕
出处 《水力发电》 北大核心 2015年第9期87-90,共4页 Water Power
关键词 社会稳定 风险分析 层次分析法 模糊综合评价 social stability risk analysis analytic hierarehy process fuzzy comprehensive evaluation
  • 相关文献

参考文献6

二级参考文献13

共引文献23

同被引文献15

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部