期刊文献+

应用萤火虫算法求解基于学习效应的PFSP问题 被引量:7

Permutation flow-shop scheduling problem with learning effect based on firefly algorithm
下载PDF
导出
摘要 针对置换流水车间调度问题,应用学习效应理论,将工件的加工时间与工件的加工位置建立联系,缩短了工件的最大完工时间,并将不同学习率下的最小化最大完工时间进行比较,给生产制造企业合理安排生产计划提供借鉴。应用MATLAB软件编写萤火虫算法,对建立的模型进行仿真测试,通过与粒子群算法和遗传算法进行结果对比,验证了算法的有效性,在此基础上求解出具有不同学习率的置换流水车间调度问题的最小化最大完工时间。 For Permutation Flow-shop Scheduling Problem(PFSP),considering the theory of learning effect,it builds relations between processing time and position in the production sequence of a workpiece,to minimize the maximum completion time(Makespan)of it.By comparing the minimizations of makespan under different learning rates to provide reference for manufacture enterprise in arranging production plans.It applies MATLAB to write the Firefly Algorithm(FA)and use it to simulate the model.By results' comparison of FA,Particle Swarm Optimization(PSO)and Genetic Algorithm(GA)to verify the validity of FA.On that basis,it solves the minimizations of makespan under different learning rates.
出处 《计算机工程与应用》 CSCD 北大核心 2015年第16期248-251,258,共5页 Computer Engineering and Applications
基金 国家自然科学基金(No.71271138) 教育部人文社会科学规划基金项目(No.10YJA630187) 上海市教育委员会科研创新项目(No.12ZS133) 上海市一流学科项目(No.S1201YLXK) 高等学校博士点基金项目(No.20093120110008)
关键词 学习效应 置换流水车间调度 萤火虫算法 学习率 learning effect permutation flow-shop scheduling firefly algorithm learning rate
  • 相关文献

参考文献16

二级参考文献94

共引文献219

同被引文献79

引证文献7

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部