摘要 绿色建筑施工阶段是对环境影响较为严重的阶段,也是风险最大的阶段。为保证绿色建筑功能的实现,必须对绿色建筑的施工风险进行研究。针对施工阶段的复杂性、不确定性,该文基于模糊数学理论,采用熵权法对绿色建筑的施工风险指标赋权,构造基于熵权的模糊综合评价模型,对绿色建筑的施工风险进行评价。 The construction stage of green building is the most serious period impacting on the environment, which also has the biggest risk. In order to guarantee the realization of the function of the green building, it is necessary to research the construction risk of green building. In view of complexity and uncertainty in construction stage, based on the theory of fuzzy mathematics, this paper determine the risk index weight of the construction by the way of the entropy weight method, and establish a fuzzy comprehensive evaluation model on the basis of entropy weight so that it can evaluate the risk of the construction of green building.
作者 常瑞阳
机构地区 兰州交通大学
出处 《价值工程》 2015年第19期37-39,共3页 Value Engineering
关键词 绿色建筑 施工风险 熵权 模糊综合评价 green building, construction risk entropy weight fuzzy comprehensive evaluation
  • 相关文献

参考文献4

二级参考文献21

  • 1Armas I, Avram E. Perception of flood risk in Danube Delta, Romania [ J ]. Natural Hazards,2009, 50 (2) : 269 - 287. 被引量:1
  • 2Zhang Kejiang, Kluck C, Achari G. A comparative approach for ranking contaminated sites based on the risk assessment paradigm using fuzzy Promethee[J]. Environmental Management, 2009, 44(5) : 952 - 967. 被引量:1
  • 3Feng Lihua, Hong Weihu, Wan Zi. The application of fuzzy risk in researching food disasters [ J ]. Natural Hazards, 2010,53 ( 3 ) : 413 -423. 被引量:1
  • 4Bhuyan A, Borah M, Kumar R. Regional flood frequency analysis of north-bank of the River Brahmaputraby using LH-moments[ J]. Water Resour Manage, 2010,24(9) :1779 -1790. 被引量:1
  • 5Huang Xin, Tan Hongzhuan, Zhou Jia. Flood hazard in Hunan province of China : an economic loss analysis [ J ]. Natural Hazards, 2008, 47( 1 ) :65 -73. 被引量:1
  • 6Liu Aixia, Lang Yinhai, Xue Lidong. Probabilistic ecological risk assessment and source apportionment of polyeyclie aromatic hydrocarbons in surface sediments from Yellow Sea [ J ]. Bull Environ Contain Tnxicol, 2009, 83(5):681 -687. 被引量:1
  • 7Seifert I, Thieken A H, Merz M. Estimation of industrial and commercial asset values for hazard risk assessment [ J ]. Natural Hazards, 2010,52(2) :453 -479. 被引量:1
  • 8重庆长江工程勘察院.渝黔高速公路K13+500~K13+960向家坡立交左侧滑坡治理工程地质勘察报告[R].重庆:重庆长江工程勘察院,2004. 被引量:2
  • 9Wunsch A, Herrmann U, Kreibich. The role of disaggregation of asset values in flood loss estimation: a comparison of different modeling approaches at the mulde river, Germany [ J ]. Environmental Management, 2009, 44(3) :524-541. 被引量:1
  • 10佘娜.基于熵权的Fuzzy法在工程风险评价中的应用[J].重庆交通大学学报(自然科学版),2008,27(1):129-133. 被引量:17

共引文献27

同被引文献62

引证文献5

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部